Create a new process for a participant or assign an existing one to them.
A process is not yet assigned to the participant.
Flow nodes cannot be displayed directly in a participant's pool. A process already needs to be assigned to a participant before its process can be modeled.
A new process can be created for a participant or an existing process is assigned to it. It is possible that the same process is assigned to various participants.
A new process is created in the Model Structure below the collaboration and assigned to the participant. The name of the process is automatically selected to be edited.
If the process was not assigned to another participant, it is assigned to the selected participant and shown as a defining view there.
If it was previously assigned to another participant, this assignment remains. The process is assigned to the selected participant and shown as a referencing view there.
The process is assigned to the selected participant and shown as a referencing view there.
Innovator X Generation 11 R4 - Copyright © 2011-2012 - MID GmbH Nuremberg - DIN EN 9001 certified - All rights reserved.